If you look after an older warehouse, factory, workshop or farm building in the UK, the roof is quite possibly asbestos cement. Builders used it for decades because it was cheap, tough and fire resistant. Now it’s old, it leaks, and you’re stuck with the big question: tear it all off, or find another way? For plenty of buildings, over cladding asbestos roof sheets with a new weatherproof system is a realistic middle option. It won’t fix everything, though, and it’s definitely not right for every roof.
Here’s what we’ll cover: what over cladding really involves, how to tell if your roof is a candidate, what pushes the price up or down, and what the rules say. I’ve kept it practical, since most readers are trying to make a decision, not sit an exam.
What Is Asbestos Roof Over Cladding?
Over cladding, sometimes called over-roofing or re-roofing over the top, means building a new roof system above the old one rather than taking the old one away. You will also see it written as “asbestos roof over cladding” when people describe the finished result.
Think of it as layers. The old asbestos-cement sheets stay exactly where they are. A frame of brackets and rails gets fixed to the building’s structure, usually the purlins, so the new roof’s weight doesn’t sit on the old sheets. Insulation can go into the gap. Then profiled metal sheets or insulated panels finish the job as the new outer weather layer.
Here’s the bit people miss: covering asbestos isn’t the same as getting rid of it. It’s still in your building. It still needs to be recorded, monitored and managed, and anyone working on or near that roof later has to know it’s there. Over cladding changes the risk, but your legal duty doesn’t go away.
Can You Overclad an Asbestos Roof?
Sometimes, yes. Not always. It really depends on a proper assessment. A contractor might give you rough advice over the phone, but the final call should come from someone who has looked at the roof, the structure and the system they plan to use.
A competent contractor or surveyor will normally look at several things before saying it can be done:
- Condition of the sheets. Cracked, crumbling or badly weathered sheets worry surveyors more than sheets that are old but still intact. Heavy moss and surface wear count too.
- Fragility. Old asbestos-cement sheets, and rooflights especially, can give way under a person’s weight. People have died falling through them, so safe access isn’t optional.
- The structure underneath. The purlins, rafters and main frame have to carry the extra dead load, plus wind and snow. That’s a structural engineer’s job, not a guess.
- Practical details. Think about where the roof meets the walls, how the gutters sit, any vents, fans or flues poking through, and how far the eaves overhang.

If the sheets are in bad shape, the frame is weak, or the work can’t be done without disturbing the material, a specialist may suggest removal and replacement instead. They’re not being awkward. They’re being honest with you.
The Benefits of Over Cladding Asbestos Roofs
Where it suits the building, over cladding has real advantages. That’s why commercial owners keep choosing it.
Avoiding immediate full removal. Stripping asbestos-cement sheets is regulated, controlled work. Enclosure, waste handling and disposal all add to the bill. Over cladding lets you push most of that cost further down the road. Handy if the building has a short planned life, or if the budget is tight right now.
Stopping leaks and weather damage. Put a new outer skin on and you’ve got a watertight roof again. A guarantee often comes with it. How long it lasts depends on the system and the manufacturer, but it’s usually a better deal than patching old sheets over and over.
Better thermal performance. Because there is a cavity, insulation can go in. For a large unheated shed that may not matter much, but for a workshop or storage unit with heating costs, it can.
Less disruption. In many cases the business can keep operating underneath, because the old roof is not being stripped. You will want your contractor to confirm this for your site rather than assume it.
A tidier building. New profiled sheets in a modern colour lift a tired-looking site, which is not nothing if you let units to tenants.
I would add one caution. Those benefits are conditional. Savings, energy gains and downtime all depend on your building and the system chosen, so treat any glossy claim of “always cheaper” with suspicion.
Risks and Limitations You Should Know About
This is the part that brochures tend to skim, so let us not.
Fibre release. Asbestos-cement that’s intact and left alone is lower risk. Things change when sheets get drilled, broken, scrubbed hard or walked on. If a badly planned job fixes straight through the old sheets, you create the very disturbance you were trying to avoid.
Extra weight. Steel sheets, rails, brackets and insulation add load. On a light, old frame that can be the deciding factor.
Fragile surfaces. Rooflights and deteriorated sheets are a falling hazard during installation. Safe working at height is a core part of the job.
Condensation and moisture. Damp air trapped between two layers is trouble. Without proper design, you can end up with condensation, corrosion or soggy insulation. So give ventilation and vapour control real thought before anything gets fixed.
Drainage and flashings. Raise the roof line and the water runs differently. Gutters, valleys and flashings often need altering. Miss one detail and it shows up later as a leak.
Future access. Think about whoever repairs, removes or demolishes the building down the line. They’ll be facing a roof with asbestos hidden under a modern covering. Good records and clear labelling save them from nasty surprises.
Weighing these points? Our guide to roofing maintenance tips for all seasons is a handy companion. It helps you keep any new roof in good order once it’s installed.
How to Overclad an Industrial Asbestos Roof
This isn’t a DIY job. Full stop. What follows is a rough picture of how a competent, contractor-led project tends to run, so when the quotes arrive, you’ll know what a good one looks like.
- Review the asbestos information. Start with your asbestos register, or a management or refurbishment survey. Nobody should pick a method until you know what the material is and what shape it’s in.
- Assess the roof and structure. First, a surveyor goes over the sheets, rooflights and fixings. After that, a structural engineer has to say whether the frame can carry the extra load. No guessing.
- Design the system. The contractor designs the brackets, rails, insulation and outer sheets around your specific building. That covers water, ventilation and edge details, and how the fixings will avoid damaging the old sheets.
- Plan safe access and work methods. Expect edge protection, crawling boards, netting or staging, and a written method statement. Walking straight onto fragile sheets? Never.
- Install. Trained operatives fit the new system to the design and the risk assessment. Drilling, cutting or fixing through the asbestos sheets is off the table, unless that exact method has been assessed and controlled.
- Inspect and hand over. Expect inspection sign-off, plus any certificates or guarantees, and some advice on inspecting and maintaining the roof later. Your asbestos register and management plan need updating too, where relevant.
Hear a contractor say, “we just screw new sheets straight onto the old ones”? Walk away. A proper design and a proper method are what separate a sound job from a future liability.
What Materials Are Used for Over Cladding?
There is no single best material, and I would be wary of anyone who claims one. The choice depends on the building’s use, budget and performance needs.
Profiled metal sheets. Steel or aluminium sheets are the common choice. They are durable and give good weather resistance. Often used with a separate layer of insulation beneath.
Insulated roof panels. These bundle the weather skin and insulation into one factory-made unit. They can go on quickly and perform well thermally. The catch is they’re often heavier and cost more, so check your frame can take them.
Other approved systems. Some projects call for lighter or specially detailed systems, especially where weight or fire performance is a worry. Whatever’s proposed must suit the existing roof and the building’s needs.
Ask about durability, insulation values, condensation control, fire performance and how it’ll be fixed. Weight matters too. You’re loading a structure that was never designed for it.
How Much Does It Cost to Overclad an Asbestos Roof?
I won’t give you a per-square-metre figure, because a made-up number does more harm than good. Prices swing a lot with the site and the market. A reliable figure only comes from an itemised quote based on a survey of your actual roof.
What moves the price:
- Roof size and shape. Big simple roofs are cheaper per square metre than complicated ones with many valleys, penetrations and abutments.
- Existing condition. More damage means more preparation and possibly repairs.
- Structural work. If the engineer asks for strengthening, that is an extra cost.
- Insulation specification. Thicker or higher-performance insulation costs more.
- Access equipment. Scaffolding, edge protection, mobile platforms and safety netting can be a big slice of the budget.
- Rooflights, gutters and flashings. Replacing or detailing these properly adds time and materials.
- Surveys and paperwork. Asbestos surveys, structural calculations and building control submissions all have a price.
- Waste handling. If any asbestos-containing debris is created, controlled disposal costs follow.
When quotes arrive, compare scope, not just totals. Check what is included for access, what happens if hidden defects are found, whether engineering is covered, and what guarantee comes with the finished roof. The cheapest figure often leaves things out.
Overcladding vs Asbestos Roof Removal and Replacement
This is the real decision for most owners, so it deserves a fair comparison.

Over cladding tends to make sense when the sheets are intact, the frame is sound, the building will remain in use for many more years, and you want to avoid a large, disruptive removal project. Initial outlay may be lower, and the work can often proceed with fewer interruptions to operations.
Removal and replacement is usually the better call when the sheets are badly deteriorated, or when the structure simply can’t carry the added load. It also makes sense if you plan to redevelop or demolish soon, or if you want the asbestos gone for good. Yes, it costs more up front, and it’s more disruptive. But when it’s done, the roof has no asbestos in it. That can make life easier for future owners, lenders and tenants.
Think about the long game, too. Overclad now, and say the building comes down in ten years. The asbestos still has to be removed then, and the new cladding has to come off first. Sometimes that makes removal today the smarter use of money. Sometimes it doesn’t. Neither route is automatically safer or cheaper, which is why you should ask for both options to be priced.
Got a flat or low-pitched commercial roof? There are other maintenance routes worth a look. Our piece on flat roof coatings as a cost-effective way to extend the life of your commercial roof shows how they compare. Just keep in mind that a coating isn’t suitable for every roof type, or for every asbestos-cement roof.
UK Asbestos Safety Rules, Building Regulations and Planning
Here I want to separate what the law requires from what a specialist might recommend, because the two get blurred.
Duty to manage. Look after a non-domestic building? Then the Control of Asbestos Regulations 2012 give you four jobs: find out if asbestos is present, check its condition, keep a record, and manage the risk. Over cladding doesn’t end that duty. The material is still there, just hidden under a new roof. The Health and Safety Executive’s guidance on managing and working with asbestos is the best starting point for the legal detail.
Licensing and notification. Does the work need a licensed contractor? Does it have to be notified to the enforcing authority? That turns on the type of asbestos material and what the work involves. Blanket claims should make you suspicious. Say one contractor tells you every over cladding job needs a licensed removal contractor. That’s too broad. Another says none of them do. Also too broad. What you want is their method explained in writing, and then you check it against HSE guidance yourself.
Building regulations. Does re-covering a roof fall under them? Sometimes, yes. It usually depends on structural implications or a significant change in weight. Your local authority building control team, or an approved inspector, can tell you for certain. Structural calculations will probably be on their list.
Planning permission. Raise the roof line and you may change the building’s height or appearance. In some locations that matters. Speak to your local planning authority before you commit. It matters most if the site is in a conservation area or has planning conditions attached.
Industry guidance. The National Federation of Roofing Contractors, at nfrc.co.uk, publishes technical guidance on asbestos-cement roofs, overcladding included. It’s also a sensible place to find competent member contractors.
Asbestos Roof Over Cladding in Birmingham
Building in Birmingham or the wider West Midlands? The same principles apply, but a few local habits are worth picking up. The region is full of older industrial estates and agricultural buildings from the post-war decades. So experienced contractors here have seen plenty of asbestos-cement roofs.
Asking for quotes on asbestos roof over cladding in Birmingham? Push for a site visit, not a desk quote. Ask for the structural engineer’s calculations too, and make sure your contractor knows the local building control process. See examples of similar completed roofs. Then check insurance, training records and references before anyone steps onto your site.
Frequently Asked Questions
Can you overclad an asbestos roof?
Often yes, once the sheets, structure and access arrangements have been assessed. If the roof is badly damaged or the frame cannot take the load, removal may be the better route.
Can you put cladding over asbestos?
You can place a new roof system above an asbestos-cement roof, but it must be designed and installed so the old sheets are not disturbed. It is not a case of fixing straight through them.
How much does it cost to overclad an asbestos roof?
It varies with roof size, condition, structural work, insulation and access needs. Get itemised quotes based on a survey, and compare what each includes.
Is it illegal to clad over asbestos in the UK?
There is no blanket ban on over cladding, but the asbestos regulations still apply to the work and to ongoing management. Requirements depend on the material and method, so confirm with HSE guidance and your contractor.
Is overcladding an asbestos roof better than removing it?
Neither is better in every case. Over cladding can cost less up front and cause less disruption, while removal deals with the problem permanently. Ask for both options to be priced.
Can you overclad an asbestos garage roof?
Sometimes, yes. Smaller roofs can follow the same assessment process, but the sheets are often fragile and the frame lighter, so get a competent assessment first.
How long can an overclad roof last?
It depends on the system and maintenance. Many manufacturers offer long guarantees on the new covering, but the lifespan also depends on the structure beneath and how well the roof is inspected over the years.
Conclusion:
Over cladding asbestos roof sheets can be a sensible, cost-conscious way to stop leaks, improve insulation and extend a building’s useful life, but only when the roof, the structure and the plans line up. The decision hinges on condition, load capacity, safe working methods, your building’s future and the legal duties that continue afterwards.
Before you approve anything, arrange an asbestos-aware roof assessment and a structural review, then ask for site-specific quotations with removal priced as an alternative. Make sure each quote spells out what is included. With that in hand, you can choose the route that suits both your budget and your building, with eyes open.




